Creating Sample for Concrete Cube Water Absorption


 Creating new sample in LERM-CIVIL for Concrete Cube Water Absorption involves 3 simple step before that it is important to note that all the Master data for the product "Concrete Cube Water Absorption" should be configured properly. Master data involves following :

  1. Parameter Master
  2. Minimum and Maximum value for each parameter as per NABL 
  3. MU value if any
  4. Grades if any
  5. Available Parameter in LERM-CIVIL for Soil includes following additional parameter can be added based on each lab's requirement the list is only indicative in nature
  •  Concrete Cube Water Absorption,

Step 1: Creating Sample Requisition Form


Step 2: Adding Sample details

This requires selecting Discipline, Group, Material, Lab location if any witness if any , additional field based on lab's requirement can be created 



Step 3: Select Parameter 

A new pop up window will open up for selecting the Parameter available for that specific product in this case "Concrete Cube Water Absorption". The selection of Parameter is based on the test to be performed you may select only the parameters which are needed 



Step 4 :Confirm the Request Form to Create Sample 


Once clicked on Confirm button a sample ID will be generated in the system along with ELN (Electronic Lab Notebook )




Assignment to Technician


Sample created in LERM-CIVIL has user right control , so user with access right to allot sample can only assign to various technician. This right can be customised based on Civil Lab requirement.

Step 1 : Selecting Sample

Select the Sample which needs assignment from user login option to allot sample in bulk is available as well 

Step 2: Assignment 


Once clicked on Allotment button a drop down of Technician will appear for selection. The technicians are the employees whose profile , signature and rights to access respective Group of material is already defined in our employee module which is included with LERM-CIVIL.



 


Calculation in ELN


 Once alloted the Technician can start working on the entry of the observation of all selected Parameters for Concrete Cube Water Absorption Testing 

Enter the start date of the test to open the calculation form for Concrete Cube Water Absorption Testing

       1) Concrete Cube Water Absorption




    Sample Approval and Certificate


     Sample data sheet and calculation completed by Technician is moved further to the respective user for Approval in most of the cases to Quality Manager/ HOD

    In LERM-CIVIL we currently have 2 level of approval which can be customised based on Individual Lab. 

    The unique requirement of Civil Material is that the reporting format is different for all products our team has successfully able to overcome this challenge and designed a custom report for each product . This format can further be customised to suit individual Lab's reporting requirement.

    The Final report comes with ULR, QR code for authenticity of the report with future option to directly upload the data to NABL block chain portal when the requirement will become mandatory in nature in coming times. 

    The customer portal is also available so that that all the Reports are available to the customer along with the option to raise sample request through web portal. 

    Final Report Output for Concrete Cube Water Absorption (Can be customised as per Lab requirement)